Qualification rate for key dimensions of the first try-outs ≥92﹪ The samples from the first mold testing (T0) will be handed to QC for inspection,whose qualification rate for key configuration dimensions should be ≥92﹪ |
| 〉 |
Accumulation quality points of the first mold test ≥90﹪ At the first testing of each mold, quality points will be calculated according to dimension and appearance of the try-outs, and movement, fitting, assembly, appearance and so on of the mold, and finally accumulated, which should be ≥90%. |
| 〉 |
Qualification rate of OTS for T1 ≥95﹪ At T1 for each mold, the qualification rate for key configuration dimensions of the first batch of molded parts handed over to customer for inspection and verification should be ≥95%, meanwhile the OTS should qualify for assembly function and appearance. |
| 〉 |
On-time delivery rate ≥98﹪ Each batch of OTS and molds should be delivered to customer on time, satisfy or even surpass their requirements on quality at corresponding milestones. |
| 〉 |
Customer satisfaction rate≥92﹪ Each batch of OTS and molds should be approved and satisfied by customer on technique, quality, lead time and service during the entire process |